There are 2 other images of this object. See our image rights statement.
See more objects with the color darkgrey darkslategrey darkslategrey darkslategrey grey or see all the colors for this object.
Object Timeline
|
|
2009 |
|
2015 |
|
2025 |
|
Large Span Rolling Bridge (not Yet Realized)
This is a Large Span Rolling Bridge (not yet realized). It was designed by Heatherwick Studio and Thomas Heatherwick. It is dated 2009.
Is it possible to make a rolling bridge long enough to span the Thames River?
After the success of its Rolling Bridge, the studio wanted to design a version long enough to cross a large river. Commissioned by the City Bridge Trust to create a float for the Lord Mayor’s Show, an annual London parade, the design team made its "float" a twenty-six-foot-long working model of this new bridge. Simpler than its predecessor, Large Span Rolling Bridge would use cables, gravity, and an electric winch to fold decks into each other to open the bridge. On this model, a handle operates a winch that pulls cables synchronized by a system of pulleys.
It is credited Courtesy of Heatherwick Studio.
- Rolling Bridge
- painted mild steel, stainless steel cable, wood, aluminum.
- Courtesy of Heatherwick Studio.
- HSP.12
- Glass Bridge (not Yet Realized)
- sheet glass.
- Courtesy of Heatherwick Studio.
- HSP.17
- Jiading Bridge (unbuilt)
- Courtesy of Heatherwick Studio.
- HSP.31
Our curators have highlighted 1 object that are related to this one.
- Garden Bridge
- Courtesy of Heatherwick Studio.
- HSP.42
This object was previously on display as a part of the exhibition Provocations: The Architecture and Design of Heatherwick Studio.